Everything else: Hive feature requests
What Hive customers ask for in everything else, with the most votes first.
- 3votes
+/- Toggle for List View
Our team primarily uses the Table view because it allows us to see all parent/child tickets using the +/- toggle without opening each ticket. It would be beneficial to have the same +/- toggle feature in the List view, as it would provide more flexibility and allow us to utilize
- 3votes
Improve the Note search feature in the action card
Please improve the Note searching feature. At times the search feature does not find the Note with the exact title.
- 3votes
Linked files to Share Point
Not planned We use Share Point for our shared access files and would like to link our Share Point files to Hive.
- 3votes
Chat feature
Ability to disable site preview in chat will save vertical (scroll-up) space when chatroom is highly active with team members.
- 3votes
Daily Time
Show in the calendar view a sum u of the estimated time that is being set per day
- 3votes
Priority is hidden in list
If a subaction is High priority, it is not visible in the list mode. It would be helpful if an Action that had a subaction(s) with an indicated priority was visible without opening all the subactions or switching views. Maybe a grayed-out triangle in the Priority indicating that
- 3votes
Email Repository for External Users
We often have to send projects for final approval to external users within our company. There are also several people we have to email frequently, and it might be easier if there was a repository of external users we have sent projects to in the past to save time looking up the e
- 3votes
Ability to 'clear' selection custom field
It would be great if a user can clear the selection if they need to restart the process.
- 3votes
Navigate to the project from the dashboard drill-down popup directly
Shipped When in the dashboard application and clicking on the button to navigate to the project from the action card, it keeps the drill-down page displayed and moves you to the project behind the screen. It would be better UI to close the dashboard drilldown screen and directly move you
- 3votes
Status updates per assignee on actions assigned to multiple users
It would be great if I could assign a card to multiple users but be able to track completion on a per assignee basis. When I assign an action to multiple users sometimes I need each assignee to complete their own "version" of the card -- something like fill out report, submit tim
- 3votes
Ability to keep member(s) when removing a team from project
Currently, when you remove a team, it removes everyone from the project. It would be very helpful if there was an option to remove a team but keep some members in the project.
- 3votes
- 3votes
Include the route and the ability to route to people (same as desktop) in the action cards
This would allow for team members to be able to use the app for routing from their mobile device to see who it is with and restart it, if needed. Currently, it seems like the only app feature is to receive notifications if a project is moving, but you cannot see it at all within
- 3votes
Ability to have View Mode in Hive Note
Similar to Google Doc's View mode, it would be helpful if a user can be in a View Mode so they don't accidentally change a Note
- 3votes
- 3votes
Ability for Hive to notify if you have uncompleted actions
It would be helpful if a bot could remind the user of actions to complete today.
- 3votes
Enable link/access to the resourcing app from actions/projects.
Links to resourcing from any project views and within action cards would reduce clicks and enable a smoother workflow. ie when booking from action card, to be able to see the effect of that booking is almost madatory. At present i need to find person in resourcing ensure they are
- 3votes
Home Page
It would be good if you could PDF the home page so that you can have a project by project overview.
- 3votes
Category sync for Tracked Time in Jira
Currently, if a user tracks time in Jira and brings it into Hive, it's placed in No Category in Hive. It would be great if the category from Jira carried over to Hiver or even matched to Project's Default Category.
- 3votes
Rich text checkbox feature should render nicely as HTML in all areas of Hive
The new checkbox functionality in action descriptions and notes is great (https://hiveteams.canny.io/feature-requests/p/check-boxes-in-action-cards). But there are certain places where the content for an Action description is rendered where the checkbox formatting is not preserve
- 3votes
- 3votes
Mirror comments from parent actions to subactions
Add a project-level setting that, when enabled, automatically mirrors comments posted on a parent action to its direct subactions. This should be configurable at the project level so teams can opt in when they want tighter context-sharing between parent and child work items. Expe
- 3votes
Ability to pull project usage report
It would be helpful for users if the admin can pull detailed reports on project history. Such as action card duplicates, project created by template or form, and more
- 3votes
- 3votes
Link an action to a note from the action itself
Add the link of an action card to a note from the action card itself so I can have the action card link when I check that note later/on a call to easy access it.
- 3votes
Layout view shortcuts
Please add layout navigation buttons on toolbar to change layout views - it is clunky at the moment and this is a very common action. Also please add keyboard shortcut for this - this is very basic, thanks!
- 3votes
Project Due Dates
I'd love to see the project due dates/durations on the Gantt Chart!
- 3votes
Show parent action due date for sub action in My actions when no sub action due date set
When only a sub action without a specific due date has been assigned to me, the main action due date does not show up in My actions, so if I have similar tasks for several days, I don't know which one belongs to which date without going to the main action card. Obviously I won't
- 3votes
- 3votes
Please do not change the size of the boxes in calendar view
When a user views/exports their Calendar View, the date boxes get smaller if it contains an action. Please allow the user to export the view without having the boxes change shape.
- 3votes
- 3votes
Alphabetize by Project Name
Alphabetize my actions to cut down on time searching for a specific project
- 3votes
- 3votes
Personalised
We would really like if you was able to personalise your workspace by changing colours, fonts etc - for example, changing the panel on the left to black as our brand is black and white.
- 3votes
- 3votes
- 3votes
Show different phases of a project, in one bar, on a Gantt chart
This will allow you to see how the timing of activities and phases of projects stack against each other for planning purposes. For example if you have a team leading several projects at once you would be able to see if the overlap of the projects is manageable based on what activ
- 3votes
Embed hive project view in external app
It would be great to be able to embed a view, such as a Gantt chart, into an external document. This could be by providing an iframe option, or by using the oEmbed standard. Ideally this would work similar to the Miro embed facility, whereby users with access can see the embed if
- 3votes
- 3votes
Flow Chart Ability Based on Dependencies
Allows for high level visual of dependency/task flow, not just a list of tasks in status view under "unstarted".
- 3votes
Ability to attach Files to the comments of newsfeed posts
The comment section of the news feed should have the same abilities as the comment sections of tasks. (Drag & DRop, formatting, tagging etc.)
- 3votes
Archive Project through API
Shipped A true/false "archive" parameter on the project that could be toggled to change the project's archive status.
- 3votes
Ability to Filter by Condition like Google Sheet
It would be very helpful if a user could filter in Table View by Condition.
- 3votes
Status Options/Selections at Project Level for Action Statuses
Add project level settings to restrict what statuses can be assigned to actions within that project. Currently, anyone can add any status to an action, so we get different statuses that mean the same thing added to one project by different users. For example one person might mark
- 3votes
Auto-archive due date notifications when marking complete
Once an action has been marked complete, the "due today" notification is no longer relevant. It would be great if marking an action complete would automatically archive any "due today" notification for that action in my inbox.
- 3votes
Open Note links in desktop app
When a Note link is shared within Hive, clicking on it opens a browser instead of the desktop app. Similar to how action card links open, redirect this to open the Note in the Hive app (popping open the desktop app window).
- 3votes
Automated List Generation of Actions by Due Date
I need a feature that automatically generates a list of actions with a specific due date. Currently, I can view and filter actions by due date using Calendar view, but it doesn't create an automated list. An automated list generation feature would greatly improve task management
- 3votes
Transfer ownership of workflows to another user
I have workflows created by a user who is no longer with us, and I need to transfer these workflows to myself. Currently, there is no option to transfer ownership of workflows in the Workflows app, which is problematic because the workflows only function on projects the original
- 3votes
Admin user access
there need to be a workspace admin and a platform admin profile, one has the ability to assig licenses and billing the other only had admin access within the workspace and projects.
- 3votes
Email to Notes
Just like I can create an Action from an email in the Mail tile, I'd like to create a Note with the copied details of an email.
Hive is built with its customers
Start a free trial to read every request and its replies in Hive Network. Teams on a paid plan also vote and post.
Start free trial Already use Hive? Sign in