Hive feature requests
What Hive customers ask for, with the most votes first. See what teams need and what the Hive team builds next.
- 2votes
Dashboard colors to include custom colors defined by the workspace custom colors
Love the custom color ability but when saving a custom color, that color is not saved everywhere in Hive. For example, custom color created in a project / at the action level is not then available in dashboards
- 2votes
Add description to Action Card templates
It would help to have a default description for some Action Card templates particularly around training tasks.
- 2votes
"Review for Team" is not "connected" to the red/green buttons that appear on the actual piece.
We use an Editorial "queue" a lot. Jobs that are routed to the "Editorial team" can be picked up by anyone available. If you're reviewing the action card, there is a button that says "Review for Team." That's how you assign the job to yourself. Also, once that's clicked, the red/
- 2votes
Remove descriptions from actions when duplicating project
When copying a project, include an option to remove description copy.
- 2votes
add projects to user
Hello It would be useful to add multiple projects to a users access in user management. As opposed to accessing each project and adding the user. This would allow a new user to quickly gain access to all of the projects they need.
- 2votes
- 2votes
Automatically populate email fields (subject line/send to fields) from action card details
Easily populate to identify referenced action card & those included. Make subject line automatically main action card title and the send to box to be populated with that task/actions' assignee.
- 2votes
Ability to clear in Selection Project Custom Field
If the Selection Project Custom Field is not set to Multi-select, the user is unable to clear the selection. Workaround: Create a "None" option in the Selection Project Custom Field.
- 2votes
- 2votes
Ability to move a linked action card to a section
For clarification, the request is for an action card from a project to be linked to a different project and organized within different sections in each project. For example, Task 1 in Project A Section I is linked to Project B Section V. These are different projects and different
- 2votes
Ability to bulk-request Status Updates
Hive introduced the great new feature to "request status updates": https://fast.wistia.com/embed/channel/2sxxw870fm?utm_campaign=Hive%202.0&utm_medium=email&_hsmi=2&utm_content=2&utm_source=hs_email&wchannelid=2sxxw870fm&wmediaid=e39f2rosou It would be hel
- 2votes
Signature customization
Color customization of fonts to abide by an institution's signature guidelines. Availability to add custom HTML colors -- specifically #E82E21.
- 2votes
Informative text while Hive Mail is loading
It would be very helpful for user to see a text ("Loading email" or "pulling email from inbox") while waiting for Hive mail to pull email This text would help users to know that their email is being pulled and can check back in later to see the emails populate.
- 2votes
The ability to link flags (multiple color combinations) to projects
We work with multiple teams from multiple countries. It would help us get more overview if we could add flags to projects.
- 2votes
Add Created Time & Completed Time to Table View as columns
Would be helpful to see the time an action was created or completed in table view in a column
- 2votes
Recurring Monthly Tasks
I'm reading that some people like having recurring tasks duplicated for the next week, month, etc, however for me, I wish the recurring would work where it would just duplicate whatever the template you outlined. We have monthly tasks that need to get completed and each time the
- 2votes
- 2votes
Enable filters settings in the Time app report to be maintained when a user logs out of Hive.
When a user logs out of Hive the filter settings in the time app report re-set.
- 2votes
"Hide Empty Columns" for Team View
Not planned This is available for Status View but not Team View. Please allow this feature for Team View.
- 2votes
Automatic inclusion of submitter name and timestamp in action card title
I want to automatically include the submitter's name and timestamp in the action card title when submitting a form. Currently, I can only map one form question to the action card title, which limits the title to just the answer to Field 1. It would be beneficial to have a feature
- 2votes
Multi-year Gantt view
Shipped Many of our projects have multi year timelines. The current yearly view is myopic. We've requested this multiple times and are trying to kick this to the front as you've said you were working on it. It's hampering the usability of the platform for us. Please prioritize it. Thanks
- 2votes
- 2votes
Desktop Apps for Linux
Desktop Apps GNU/Linux
- 2votes
Enable the ability to arrange the apps on the left hand navigation
As a user I want to be able to arrange the pinned apps on the left hand navigation in to a useful order, the same way I can arrange my pinned projects. Currently they arrange in the order I turn them on and I want to ensure I have the most prominent or used pinned apps at the top
- 2votes
Automate email notifications for News posts
I would like an option to automate sending email notifications when a new News post is published, similar to the existing feature for actions. This would ensure that all members are promptly informed about new posts.
- 2votes
include category option in notes
or add tag options for notes
- 2votes
Acceptance critera
As a scrum master using Hive, I'd like to see a field for acceptance criteria within task card
- 2votes
Send/Archive button for email
Send emails from action cards, would be nice to send/archive so they don't clutter the inbox
- 2votes
Auto show replies to comments in proofing portal
When someone has added additional posts to an original comment or replies to a comment in the proofing portal, there is currently no indicator that this has happened. You can only see the additional comment posts if you click on the original comment. It would be extremely helpful
- 2votes
Export table view to pdf
I can see a graph of my choosing and my high-level actions/choice of preset actions but currently can only export to excel. I would like to be able to export what I see on my screen to pdf. (like the overview page).
- 2votes
Ability to resize boxes
It would be great to utilise the whole screen and be able to resize the boxes with the analytics data
- 2votes
Allow to see more info on the action card in Monthly view Calendar view
When in monthly view, it would be useful to see the name of the event, event time, banner type, and department that has the banner reserved.
- 2votes
- 2votes
Ability to restrict proof download to external users
Currently, the external member is allowed to download proof. It would be helpful if Admin/project owner can restrict this for external members.
- 2votes
Allow Child Projects to Share Public Link
Shipped Share Public Link only works for parent projects. Please allow child projects as well.
- 2votes
Inform the user why the import failed
When a user is making an import and the import fails, please inform the user why it failed.
- 2votes
Ability to not have subaction's estimates add up in parent action card
Currently, in a parent action card, the subaction's estimated time adds up. Please give the option of not adding these up in the parent action card.
- 2votes
- 2votes
Delete custom presets that I have created?
I would like to delete some unnecessary customs presets that I no longer need but I cannot see an option to delete them anywhere, I can only see the option to create a new preset.
- 2votes
Add automated search functionality
Would like a quick option to search within the project/action card you are currently viewing.
- 2votes
Offer target number tracking functionality
Our team is looking for a way to track target numbers. A feature that would show (perhaps in percentage) "# of current targets reached" in comparison to "total target #s", would be a great way to track progress.
- 2votes
In Table view, allow selection box to exceed the width of the column
In Table view, a selection box for a field is as narrow or wide as the column itself. Text wraps to accommodate. If the column is too narrow the result is an unreadable selection box. Allowing the selection box to be wider than the column should solve this. See two pictures attac
- 2votes
Same date format in Table View and Gantt View table when inserting start / due dates
To enhance user experience, ensure consistency in inserting start and due dates across both table view and the table in Gantt view.
- 2votes
- 2votes
Assignees to a Card who are not on the Project
I have projects set up with each of my direct reports. Action cards within the project sometimes require collaboration with other team members. It would be helpful to add those team members to the card without having to add them to the project (as there are other cards within the
- 2votes
Ability to have multiple of the same type of operation
I love the new automation feature, and think it would be really helpful for setting up new projects for my team. Because of the type of projects we have, its not easy to set up templates for every type of project without having 20-30 someodd templates. My solution to this is to e
- 2votes
Bank holidays considered as Leave
In teams operating in multiple countries, people don't have the same bank holidays. Now that people can be assigned to a country calendar, could these bank holidays be considered as "Leave" time when filtering in the "Resourcing" view?
- 2votes
Proof Comments Only for Internal Members
Currently, if an external proofer leaves a comment, it's visible to all. Having comment only be visible to members of workspace would be useful.
- 2votes
Responsive Desktop sizing
The Desktop is not responsive to my screen size and I cannot get all the content to fit. I use a weird 2nd monitor orientation (portrait not landscape), but I wanted to share my request for improvement here. Thanks!
- 2votes
Project Start to End Date duration
When viewing a project at the top level, the start and end date can be set, but the duration does not take into consideration the settings to not include weekends or non working days as individual action cards do. The ask is that the duration of anything throughout Hive follow th
Hive is built with its customers
Start a free trial to read every request and its replies in Hive Network. Teams on a paid plan also vote and post.
Start free trial Already use Hive? Sign in