Assign User to Only Unassigned Subactions (placeholder for action cards, not projects)
On our team, we have "special teams" who are one or two person teams that always work on specific tasks for each and every project (project = action card), and then 10 or so designers who are each assigned to an overall project and rely on assistance from the special teams. Only one, maybe two, designer(s) is ever assigned to each action card at a time.
For any given project, our special teams are always assigned to the same subactions via the action card templates, and any subactions that will eventually be assigned to the designer are left unassigned.
If I know which designer will be working on a project, I can assign them to the card, and then apply the action card templates, which auto-assigns them to any subactions that are not yet assigned.
But if I apply action card templates before assigning a designer, then I need to go and individually assign the designer to every unassigned subaction on that action card, as the only option you are given is to assign them to all subactions, or to none of them.
It would be great if, when an unassigned action card that has subactions already set up (some of which are already assigned to users) is finally assigned, that you are given an option (whether prompted or automatically via settings) to assign all the still-unassigned subactions to the same user assigned to the action card.
Something similar to placeholders would be great, but placeholders is a project-wide tool, so if I set up a Designer placeholder and assign it on one action card, it assigns that user to ALL our action cards (which can be upwards of 150+ action cards, depending on the time of year). I would love if this feature could be limited to individual action cards instead of being project-wide.
Read the full discussion in Hive Network
Start a free trial to read every request and its replies in Hive Network. Teams on a paid plan also vote and post.
Start free trial Already use Hive? Sign inMore everything else requests
- 372votes
Timeline
Shipped Provide functionality to generate an independent timeline (e.g., high level perspective) of project activities and milestones, like in MS Project. Should be able to build independent from Gantt chart. Gantt chart needs to let users configure the time scale, because current implem
- 344votes
UNDO BUTTON
Shipped I have no idea how this is not a feature. Control Z only works of you are still in the cell. Generally, you don't even know you have made a mistake until you leave the cell. The amount of time I have wasted recreating cells
- 302votes
Dark Mode
Shipped The screen is bright and having to look at it all day hurts my eyes. A dark mode would be nice to give my sight a break from staring at screens all day.
- 235votes
Customize notifications per project
Shipped As a manager, I'm on over 50 projects and am receiving many desktop notifications. Ideally I’d love to set notifications to be customized on the project level if not just the individual actions assigned to myself. It would be nice to toggle which projects you get notifications fo
- 234votes
Bulk editing
Shipped I wish there was a way to bulk edit actions or projects. For example in Table view I might see dozens of actions that all need to have their labels updated or their due dates updated. Currently i have to open every one individually which takes forever and stunts my productivity.